Hwy 417 – Noise Barrier Wall Installation

 

MTO East Region (Ottawa)

March 2019 – June 2020

As part of MTO Capital Contract 2018-4020, Peninsula Construction was able to support West Carleton Sand & Gravel with various staging and installation services along Hwy 417 in Ottawa.

Peninsula Construction was able to support construction by removing over 250 metres of steel beam guide rail and providing approximately 130 metres of temporary construction barrier.

The project which began in March of 2019 and was completed in June 2020, included the installation of both a 422 metre ground mounted noise barrier wall and an 89 metre MASH TL-4 structure mounted noise barrier system. 